<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
<channel>
<title>Efficy Overflow Q&amp;A - Recent questions tagged synchronization</title>
<link>https://overflow.efficy.io/?qa=tag/synchronization</link>
<description>Powered by Question2Answer</description>
<item>
<title>Timeout when importing Woocommerce data from Productvariations Table</title>
<link>https://overflow.efficy.io/?qa=6990/timeout-when-importing-woocommerce-productvariations-table</link>
<description>&lt;p&gt;Hi,&lt;br&gt;
I'm trying to get data from a Woocommerce website and the process with the Efficy datasynchro tool doesn't ends.&lt;br&gt;
I'm using a specific ODBC (Cdata driver) driver to access to the Woocommerce database.&lt;br&gt;
&lt;strong&gt;Question :&lt;/strong&gt;&lt;br&gt;
Is there any parameters for this kind of processes ?&lt;br&gt;
Thank you Dimitri&lt;/p&gt;
</description>
<category>Errors</category>
<guid isPermaLink="true">https://overflow.efficy.io/?qa=6990/timeout-when-importing-woocommerce-productvariations-table</guid>
<pubDate>Fri, 20 Oct 2023 13:19:02 +0000</pubDate>
</item>
<item>
<title>How to extract blob data from a Maximizer Database to an Effciy database</title>
<link>https://overflow.efficy.io/?qa=6764/extract-blob-data-from-maximizer-database-effciy-database</link>
<description>&lt;p&gt;Hello,&lt;br&gt;
I need to import all the documents from a Maximizer SQL Database to an Efficy Database.&lt;br&gt;
Is it possible ?&lt;br&gt;
If yes how ?&lt;br&gt;
Thank you&lt;br&gt;
Dimitri&lt;/p&gt;
</description>
<category>Efficy/ Client side</category>
<guid isPermaLink="true">https://overflow.efficy.io/?qa=6764/extract-blob-data-from-maximizer-database-effciy-database</guid>
<pubDate>Sun, 20 Nov 2022 21:32:39 +0000</pubDate>
</item>
<item>
<title>Exchange provider that allow impersonate rights modification</title>
<link>https://overflow.efficy.io/?qa=6612/exchange-provider-allow-impersonate-rights-modification</link>
<description>&lt;p&gt;Hello all,&lt;/p&gt;

&lt;p&gt;A client has an Exchange server provided by OVH (no Office 365). Their issue is that OVH won't let them setup impersonate rights on an user to sync with Efficy.&lt;/p&gt;

&lt;p&gt;They do not want to migrate to Office 365 or get an On premise server for this.&lt;/p&gt;

&lt;p&gt;Does anyone know of a client that has an Exchange server provider that can allow impersonate rights ?&lt;/p&gt;

&lt;p&gt;It's a French client so a French provider/Hosted in France would be nice. &lt;/p&gt;
</description>
<category>IT</category>
<guid isPermaLink="true">https://overflow.efficy.io/?qa=6612/exchange-provider-allow-impersonate-rights-modification</guid>
<pubDate>Mon, 27 Jun 2022 08:03:34 +0000</pubDate>
</item>
<item>
<title>How to hide an event detail coming from Outlook Exchange to Edeal CRM ?</title>
<link>https://overflow.efficy.io/?qa=6391/how-hide-event-detail-coming-from-outlook-exchange-edeal-crm</link>
<description>&lt;p&gt;Hello, &lt;/p&gt;

&lt;p&gt;I would like to help one of our clients to hide some details (Subject, description, place, etc.) of the event coming from Outlook Calendar (We're using the groupware synchronization task ! )&lt;br&gt;
Is there any way to make this happen in the sync model  ?&lt;/p&gt;

&lt;p&gt;Suggestions are welcome&lt;/p&gt;

&lt;p&gt;Thank you !&lt;/p&gt;
</description>
<category>E-Deal support</category>
<guid isPermaLink="true">https://overflow.efficy.io/?qa=6391/how-hide-event-detail-coming-from-outlook-exchange-edeal-crm</guid>
<pubDate>Thu, 09 Dec 2021 16:27:01 +0000</pubDate>
</item>
<item>
<title>Can you control the frequency of the validation phase during the Exchange sync ?</title>
<link>https://overflow.efficy.io/?qa=803/can-control-frequency-validation-phase-during-exchange-sync</link>
<description>&lt;p&gt;We have a customer who works with the local Outlook sync.&lt;/p&gt;

&lt;p&gt;They only want one directional syncs.&lt;br&gt;
But when they delete an appointment in Outlook it isn’t deleted in Efficy.&lt;/p&gt;

&lt;p&gt;But it will come back in the validation phase.&lt;br&gt;
That validation phase only occurs every 10-20 syncs.&lt;/p&gt;

&lt;p&gt;Is it possible or is it already the case that we place in the register the parameter that controls the amount of syncs after which the validation occurs?&lt;br&gt;
And this for the local sync utility.&lt;/p&gt;

&lt;p&gt;That way we can control it depending the customer desire to have it e.g. every sync.&lt;/p&gt;

&lt;p&gt;We can’t ask the customer to sync 20 times on the local sync to be sure everything is synced like they want.&lt;/p&gt;
</description>
<category>Efficy/ Client side</category>
<guid isPermaLink="true">https://overflow.efficy.io/?qa=803/can-control-frequency-validation-phase-during-exchange-sync</guid>
<pubDate>Tue, 06 Oct 2015 08:16:09 +0000</pubDate>
</item>
<item>
<title>Configuring ScheduledProcesses using XML file</title>
<link>https://overflow.efficy.io/?qa=312/configuring-scheduledprocesses-using-xml-file</link>
<description>&lt;p&gt;Is it possible to configure the new Exchange Sync Queue (+ init + validation), by editing XML file of ScheduledProcesses ? &lt;/p&gt;

&lt;p&gt;The main goal is to configure the service by editing configuration file , without using GUI. &lt;/p&gt;

&lt;p&gt;What I am willing to achieve is : pushing configurations and files to the server, without having full access to it. &lt;/p&gt;
</description>
<category>Efficy Developers</category>
<guid isPermaLink="true">https://overflow.efficy.io/?qa=312/configuring-scheduledprocesses-using-xml-file</guid>
<pubDate>Fri, 27 Mar 2015 11:30:40 +0000</pubDate>
</item>
</channel>
</rss>